Well it is day 4 of the Elecraft K2 build. Today I started on the Front Panel assembly. All of the parts for the front panel come bagged up together.
Front Panel components |
The parts were dumped out on the table and sorted prior to assembly.
Front Panel components before sorting |
A spacer is used to assure that all of the push button switches are at the same hight. The spacer is also the circuit board that is used for the RF probe.
Using spacer to set switch height before soldering |
All the switches have been added to the front panel board and have been soldered. Looking good so far..
Switches added to the Font Panel board |
No comments:
Post a Comment